Broad and Spruce Garage

A 220 car post-tensioned concrete garage added to an existing 428-car garage to produce a facility with a total capacity of 648 cars. This building is designed as a platform for a future 500-hotel room addition to be built above and to accommodate a 300-seat theater below. Project Abandoned.